![]() |
Hansehafen Magdeburg Bank Reinforcement Excavation and Filling Establishment of a trimodal transshipment port on the west bank of the connection channel in Rothensee. |
|||||
![]() |
Bank Reinforcement The 1,350 m long dock is planned as a perpendicular bank for heavy piece goods and container transshipment including the surface back filling (approx. 450,000 m³) behind the sheet pilewall as well as a connection to the existing pilewall with a length of 110 m. The connection is planned as a semi-high pilewall with pile dolphin and gabion sheeting. |
Client Magdeburger Hafen GmbH |
||||