Uferbefestigung Hansehafen Magdeburg   Hansehafen Magdeburg
Bank Reinforcement
Excavation and Filling

Establishment of a trimodal transshipment port on the west bank of the connection channel in Rothensee.

         
Uferbesfestigung Hansehafen Magdeburg   Bank Reinforcement

The 1,350 m long dock is planned as a perpendicular bank for heavy piece goods and container transshipment including the surface back filling (approx. 450,000 m³) behind the sheet pilewall as well as a connection to the existing pilewall with a length of 110 m. The connection is planned as a semi-high pilewall with pile dolphin and gabion sheeting.

 

Client Magdeburger Hafen GmbH
Construction costs 7.4 mill. Euro
Period 1998 - 2006
Services Building design for engineering constructions, structural engineering, tender/site management, on-site supervision